الأخبار الرئيسية » العلاقات العامة » الأخبار  
Erection of the boilers in Yanbu III 16/6/2015
The erection of the boilers is progressing fast, with the steel structure of 4 of the 5 units completed
Al Toukhi signed the contract to build the Substations for the Riyadh Metro 9/11/2014
17/7/2014
10/6/2014